Both 095 and 096 were supposed to be a radical leap over 093 and 094
Replying to: Basically. Could mean problems with the 095 and 096 designs. -- Canis Majoris Post ReplyForum


-Corsair-

11/04/2023, 22:42:39




Author Profile | Edit


so I am not surprised if there is a delay or if the actual schedule was in fact supposed to be longer than we watchers anticipated. Now, the curious thing is that the US report to Congress is now saying the latest 094 have JL-3. This is a surprise to me because I thought JL-3 was still undergoing testing and the newer 094 don't have larger missile tubes or turtleback compared to the earlier ones, so the missile size is exactly the same on all boats. Wasn't the JL-3 supposed to be larger than JL-2 with MIRV and a significantly improved range?





Recommend | Alert |
Where am IGo Up Go TopPost ReplyBack

Followups

�������ʿ֪ʶ��Ȩ����ʤ

Copyright Infringement Jury Trial Verdict

Copyright Infringement Lawsuit Software Jury Trial Verdict

Judge James Ware Presiding: Copyright Infringement Trial

Copyright Trial Attorney

Ninth Circuit Copyright Law - Copyright Jury Trial