CV-16 Liaoning.
J-15 onboard Liaoning.
CV-17 Shandong and 052C 170.
CV-18 Fujian's radars installed.
CV-18.
The EMAL work cover revealed openings.
Work on 004 has begun, as in subsystem ordered has begun their delivery and so on. A rumor hint that 004 will begin construction in Dalian shipyard soon.
KJ-600.
Naval Z-20.
More naval Z-20, with sonobuoy launcher, and folded rotors in the hangar.
YJ-18A hot launch.
130 main gun and T-1130 open fire onboard 055.
Two 055.
055 Nanchang.
New batch of 055 under construction.
052D, 054A undergoing replenishment.
137 Sovernmeny after refit.
051B Shenzhen after refit.
525 and 526, the two original 054 after refit.
New batch of 054A consisting of the 30th to 40th ship. With four AESA HHQ-16 illuminator replacing the original MR90 illuminator onboard previous batch of 054A. MR90 can only illuminate one target at a time, while the new AESA illuminator can illuminate multiple targets, which means the new
054A can engage more than four targets simultaneously.
Another 054A from the new batch.
054B under construction in Hudong shipyard.
054B comparison with 052D.
054B construction in Huangpu shipyard.
Said to be the most accurate CG depiction of 054B.
075.
Ka-31 AEW take off from 075.
T-1130 firing onboard 075.
726 entering 075 Hainan.
071 conducting amphibious landing.
Two 071.
728 indigenized Zubr.
Either a new 075 or 076.
075 vs 076.
093B.
Improved pump jet propulsion to be used in upcoming new generation of SSN/SSBN.
039B.
A rumor that construction of a hybrid SSK/SSN, powered by miniature nuclear plant, perhaps the so called 041, will start in other shipyard other than Huludao.
Dragon boat festival.